U-Linertrailer BRT 25 / Cement Mortar Winch RW 3 ZM
BRT25 and RW 4000 Application: Renewal of a gas pipe
After pulling-in the U-Liner and installing it by air-pressure and hot steam it is joined with the old pipe .
RW 3ZM Application: Renewal of a fresh water pipe by cement mortar lining
After cleaning the pipe gets coated with cement mortar.
The hose bundle of the RW 3ZM is to be pulled in the pipe and connected to the centrifugal machine.
One hose is for pumping in the cement mortar, the other supplies the centrifugal turbine with compressed-air
While coating the RW 3 ZM pulls the centrifugal turbine through the pipe in absolutely constant speed.



